Explore the Cape Nelson North/Sir William Grant wind farm The last stage of the Portland Wind Energy Project, PWEP IV, covering two sites – Cape Nelson North and Cape Sir William Grant – was completed in 2015. The project comprises 23 Repower turbines with a combined capacity of 47.2MW, which will generate around 153 GWh of clean energy each year or enough power for the equivalent needs of around 31,000 Victorian homes. The turbines installed are Senvion MM82 and MM92 wind turbine generators, rated at 2.05MW each, with a maximum hub height of 80m and a maximum tip height of 126.5m. As part of the operation of the project, Pacific Blue continues to invest in local community initiatives via the Sustainable Communities Fund. Documents Bushfire Mitigation Plan 2024-2025 (5.84 MB) Electric Line Clearance Management Plan (2.56 MB) Empowering local communities. Learn how our Community Benefit Sharing Program gives back to the communities that host our projects with positive and lasting social, environmental, and economic benefits. Learn more Contact Us We’re here for you via chat, email or phone, Monday to Friday. Ways to contact us